Choose language
UK & Ireland
Choose different website
Current website:
UK & Ireland
Website / Country
Languages
Social Media
Website / Country
Languages
Social Media

local case study

United Kingdom

Meadow Farm

Meadow Farm Battery Limited are proposing to build a 57 MW Battery Energy Storage System (BESS) facility on land southeast of The Carss Angling Lakes, Letch Lane, Carlton, Stockton-on-Tees.

BESS facilities are important infrastructure that enable energy from renewable sources, such as solar and wind energy to be stored and then released when the National Grid requires power. BESS facilities are essential to facilitate the transition to a low carbon economy and achieve the UK’s goal of net-zero carbon by 2050. BESS facilities enable homes and businesses to be powered by renewable energy even at times when the sun isn’t shining and the wind isn’t blowing. 

57 MW of installed capacity
Project status consented

local case study

United Kingdom

Meadow Farm

Meadow Farm Battery Limited are proposing to build a 57 MW Battery Energy Storage System (BESS) facility on land southeast of The Carss Angling Lakes, Letch Lane, Carlton, Stockton-on-Tees.

BESS facilities are important infrastructure that enable energy from renewable sources, such as solar and wind energy to be stored and then released when the National Grid requires power. BESS facilities are essential to facilitate the transition to a low carbon economy and achieve the UK’s goal of net-zero carbon by 2050. BESS facilities enable homes and businesses to be powered by renewable energy even at times when the sun isn’t shining and the wind isn’t blowing. 

57 MW of installed capacity
Project status consented

Project Location

Find out more about this project
Back to top
Get in touch