local case study
United KingdomWhitelaw Brae Wind Farm is located approximately 3 km south of Tweedsmuir in the Scottish Borders. Consent for the construction and operation of the Whitelaw Brae Wind Farm was granted by Scottish Ministers in December 2017 and BayWa r.e. acquired the project in May 2019.
The Whitelaw Brae Wind Farm project will comprise of up to 14 turbines with a maximum height to blade tip of 133.5 m and has secured a grid connection for 57 MW. The wind farm was consented by Scottish Ministers in 2017 and the BayWa r.e. team are now working to prepare the development for construction.